Typical applications/TA-1Buildable

Work Beyond the Shoulder

Work entirely off the roadway, behind the shoulder. Advance warning only, no lane closure.

MUTCD Figure 6P-1

Posted speed limit, off-peak 85th-percentile speed prior to work starting, or anticipated operating speed.

ft

How far traffic is moved sideways — usually the width of the closed lane.

Open in plan builder

Plan view

635 ft, to scale
W20-1A (Table 6B-1)

Redrawn from MUTCD 11th Edition Chapter 6P, which is public domain. Devices are shown at the MUTCD spacing for 35 mph; signs are drawn oversize for legibility.

Computed for your conditions

MUTCD 11th Ed

shoulder taper

at least 0.33 L

85 ft

Base L

Table 6B-4

245 ft

Device spacing in taper

1 × speed, Section 6K.01

35 ft

Device spacing on tangent

2 × speed, Section 6K.01

70 ft

Advance warning area

Table 6B-1

300 ft

Longitudinal buffer

Table 6B-2

250 ft

Total zone length

935 ft

Sign schedule

Tables 6G-1, 6H-1

W20-1 — ROAD WORK AHEAD

36" × 36" minimum

1

Notes from the MUTCD figure

  • Option: the ROAD WORK AHEAD sign may be replaced with another appropriate sign such as SHOULDER WORK.
  • Option: the ROAD WORK AHEAD sign may be omitted where the work space is behind a barrier, more than 24 inches behind the curb, or 15 feet or more from the edge of any roadway.
  • Guidance: if the work space is in the median of a divided highway, an advance warning sign should also be placed on the left-hand side of the directional roadway.
  • Standard: vehicle hazard warning signals shall not be used instead of the vehicle’s high-intensity rotating, flashing, oscillating, or strobe lights.

Notes paraphrase the MUTCD figure's own Notes block, preserving the manual's Standard / Guidance / Option force. Read the figure itself before you submit.